2016

LAPLACE Renewable Energy Technology Co., Ltd. was incorporated in Shenzhen

2016

2017

2017

> Accelerating new product development and exploring new technologies in an orderly manner
> Finalized the 1st generation Boron Diffusion Equipment for sale

2018

> Finalized Vertical PECVD Equipment for sale;
> Finalized LPCVD equipment for sale
> Mass-produced TOPCon

2018

2019

2019

> Finalized Phosphorus Diffusion Equipment and 2nd generation Boron Diffusion Equipment for sale;Mass-produced PERC+SE
> TOPCon mass production achievement

2020

> Finalized Sic, GaN Ultra-high-temperature Oxidation Furnace / Annealing Furnace /Vacuum Brazing Ffor 3rd generation semiconductor equipment for sale
> Obtained the first order for 3rd generation semiconductor equipment
> Finalized the 3rd generation equipment for Phosphorus Diffusion, Boron Diffusion, and LPCVD for sale

2020

2021

2021

> Launched LAPLACE Wuxi Base into operation
> Continuously upgraded and iterated equipment, launched 4th generation equipment,with a total shipment of high-efficiency battery core equipment exceeding 20GW

2022

> Dominates Boron Diffusion and LPCVD market share
> Orders for PECVD and phosphorus diffusion exceeded 200 sets
> In-house production capability of core components and breakthrough of quartz component lifetime

2022

2023

> Equipment continually upgraded
> LAPLACE Guangzhou Base kicked off construction
>LAPLACE Shenzhen Base bid for self-owned land
> More than 200GW of equipment delivered

Back to top